Pages

Piping Interview Questions

   Piping Interview Questions-Part-01


         1. Write the weld layers?
1.       Root
2.       hot pass
3.       fill
4.       cap


         2. Accepted miss alignment in piping?
1.       1.5mm as per ASME 31.3
2.       1.6mm as per ASME sec IX


         3.What is Mean ITP?
                       An Inspection and Test Plan (ITP) or test plan is a document detailing a systematic approach to testing a system or product (e.g. material, component, machine, etc) such as a visual inspection, dimension inspection, welding inspection, function test, factory acceptance test, etc. and participation of all parties.


          4. What are the four types of inspection stage? Explain.

1.Hold 2.witness 3.Surveillance 4.Review

Hold: QA/QC Organization shall be noticed of the timing of inspection or test in advance. Inspection or test shall not to carry out QA/QC organization representative in attendance

Witnness: QA/QC Organization shall be noticed of the timing of inspection or test in advance. Inspection or test shall be performed as schedule if the QA/QC Organization representation is not present

Survellance:QA/QC Organization monitoring the work in process without notice from construction Organization

Review:Review and approval all documents



           5. Explain about ‘specifications’?

               Specifications are guideline detail for construction requirement and minimum quality standard are listed.



            6. What is P&ID?
               A piping and instrumentation diagram, or P&ID, shows the piping and related components of a physical process flow. (Branches, reducers, valves, equipment, instrumentation and control interlock)


      7. What is WPS?
              A Welding Procedure Specification (WPS) is the formal written document describing welding procedures, which provides direction to the welder or welding operators for making sound and quality production welds as per the code requirements


8.  What is PQR?
                A PQR is a record of a test weld performed and tested (more rigorously) to ensure that the procedure will produce a good weld. A WPS is supported by a Procedure Qualification Record (PQR)


9. What is WPQ?
                        A Welder Performance Qualification (WPQ) is a test certificate that shows whether a welder possesses the necessary experience and knowledge to perform the specifications of a particular weld procedure



 10.Different between Pipe and Tube?

           PIPE:It is identified by NB(Nominal Bore) and its thickness is identified by schedule
           TUBE:It is identified by OD (Outside Diameter) and its thickness is identified by BWG (Birmingham Wire Gauge)


5 comments:

  1. Great piece of information, Thank you for sharing the updated one...
    Welding Inspector Spain
    Painting Inspector Scotland

    ReplyDelete
  2. thanks for short, useful information

    ReplyDelete
  3. I want to share with you all here on how I get my loan from Mr Benjamin who help me with loan of 400,000.00 Euro to improve my business, It was easy and swift when i apply for the loan when things was getting rough with my business Mr Benjamin grant me loan without delay. here is Mr Benjamin email/whatsapp contact: +1 989-394-3740, lfdsloans@outlook.com

    ReplyDelete