It’s Share about Piping and Mechanical Work This Page Explain About Piping and Mechanical Work-Fabrication,Erection,Testing and Commissioning Work ,Piping Design Calculation and Formulas,Reading Isometric Drawings
Sunday, 24 January 2016
Procedure Qualification Record (PQR or WPQR)
Procedure Qualification Record (PQR or WPQR).
A PQR is a record of a test weld performed and tested (more rigorously) to ensure that the procedure will produce a good weld.
Some essential instruments for Procedure Qualification Record (PQR):
Thermometer,
Clamp meter,
Torch,
Thermal chalk,
welding bevel gauge..
Friday, 22 January 2016
Subscribe to:
Posts (Atom)